Series I: Cosmic Background Explorer (COBE) records of George Smoot
|
| Box 1 |
Folder 1 |
Observational Cosmology: A Measurement of the Low Frequency Portion of the Spectrum of the Cosmic Microwave Background Radiation Volumes 1-2, |
|
Folder 2 |
GHz Asymmetry |
|
Folder 3 |
Radiometer |
|
Folder 4 |
VLA Observer's Information Sheet - Kogut, A. |
|
Folder 5 |
Thermal Emission from Ionized Hydrogen, 1977 |
|
Folder 6 |
Formaldehyde Absorption Toward W51 - A. Kogut, G.F. Smoot |
|
Folder 7 |
DMR Group Emails |
|
Folder 8 |
[Things to Take to White Mountain - Checklists] |
|
Folder 9 |
10 GHz |
|
Folder 10 |
[Vacuum Pumps] |
|
Folder 11 |
VLA Observational Status Report, 1986 |
|
Folder 12 |
[White Mountain] |
|
Folder 13 |
WM Logs |
|
Folder 14 |
Bolometer and Calibration - Al Kogut |
|
Folder 15 |
Microfabrication Laboratory EECS / ERL |
|
Folder 16 |
DMR User Guides |
|
Folder 17 |
CSDR Mission Planning Displays Facility, September 16, 1986 |
|
Folder 18 |
Astrophysics Data Operations, April 15, 1986 |
|
Folder 19 |
COBE Science Data (CSDR) System Concept Design Document September, 1985 |
|
Folder 20 |
COBE System Concept Review Vol. II DIRBE and DMR Instruments, July 27, 1982 |
|
Folder 21 |
COBE System Concept Review Vol. III Observatory Subsystems, July 28, 1982 |
|
Folder 22 |
COBE System Concept Review Vol. IV Test/Operations and Data System, July 29, 1982 |
|
Folder 23 |
Critical Design Review for the COBE Science Data Room (CSDR) Day One, Morning, March 26, 1987 |
|
Folder 24 |
Critical Design Review for the COBE Science Data Room (CSDR) Day One, Afternoon, March 26, 1987 |
|
Folder 25 |
Critical Design Review for the COBE Science Data Room (CSDR) Day Two, March 27, 1987 |
|
Folder 26 |
COBE Transition Status Review CSDR, December 10, 1990 |
|
Folder 27 |
COBE Instrument Technical Status Review Day 1 Morning General Topics, July 20-23, 1987 |
|
Folder 28 |
COBE Instrument Technical Status Review, Day 1 Afternoon DIRBE, July 20-23, 1987 |
|
Folder 29 |
COBE Instrument Technical Status Review, Day 2 DIRBE, July 20-23, 1987 |
|
Folder 30 |
COBE Instrument Technical Status Review, Day 3 Morning FIRAS, July 20-23, 1987 |
| Box 2 |
Folder 1 |
COBE Instrument Technical Status Review, Day 3, Afternoon FIRAS, July 20-23, 1987 |
|
Folder 2 |
COBE Instrument Technical Status Review, Day 4 DMR, July 20-23, 1987 |
|
Folder 3 |
DMR CDR Detailed Documentation |
|
Folder 4 |
Cosmic Background Explorer (COBE) L&EO All-Hands Briefing, November 17, 1989 |
|
Folder 5 |
Technical Status Review COBE DMR, September 15, 1986 |
|
Folder 6 |
Performance Specification, Program, Requirements, and Design Guidelines for the Diffuse Infrared Background Experiment (DIRBE) for the Cosmic Background Explorer (COBE), December 1982 |
|
Folder 7 |
COBE Project CSDR Facility and Project-Controlled Software Requirements COBE-SR-730-1502-04 Revision 2, November 24, 1987 |
|
Folder 8 |
Technical Data |
|
Folder 9 |
Guidelines for Preparing an Experiment Requirements Document (ERD) for COBE Instruments, March 8, 1982 |
|
Folder 10 |
COBE Observatory Structural, Power, Telemetry Thermal and Mission Phase Power Status Sumamries Rev. B and Rev. D, 1984-1985 |
|
Folder 11 |
COBE Delta Preliminary Interface Meeting, September 25, 1986 |
|
Folder 12 |
Data Submittal for Phase 0 Safety Review by Space Transportation System launch / Landing Site Operator for Cosmic Background Explorer, December 1983 |
|
Folder 13 |
Data Submittal for Safety Review by Space Transportation System Flight Operator for Cosmic Background Explorer Payload (Phase I) and Delwar Subsystem (Phase II), May 1984 |
|
Folder 14 |
Engineering Drawings DIRBE/FIRAS |
|
Folder 15 |
COBE Radiation Environment |
|
Folder 16 |
Interim Study Report for Cosmic Background Explorer, February 1, 1977 |
|
Folder 17 |
Interim Study Report for Cosmic Background Explorer Appendixes, February 1, 1977 |
|
Folder 18 |
Instrument Definition Report - Design Studies for a Far Infrared Absolute Spectrometer for the Cosmic Background Explorer, January 1980 |
|
Folder 19 |
90 GHz Anisotropy Log I Copy |
|
Folder 20 |
90 GHz Anisotropy Log II Copy |
| Box 3 |
Folder 1 |
90 GHz III |
|
Folder 2 |
Verification Plan and Specification for Cosmic Background Explorer (COBE), December 1987 |
|
Folder 3 |
DIRBE Specifications |
|
Folder 4 |
DIRBE Proposal |
|
Folder 5 |
Space and Earth Sciences Systems and Scientific Data Analysis Support Monthly Report, July 1990 |
|
Folder 6 |
Applied Engineering Software Systems Development and Analysis Support Monthly Report |
|
Folder 7 |
On Orbit Engineering Performance COBE Vol. 1 GSFC, March 7-8, 1990 |
|
Folder 8 |
On Orbit Engineering Performance COBE Vol. II GSFC, March 7-8, 1990 |
|
Folder 9 |
COBE Observatory TV/TB/Mission Operations Test - Thermal Subsystem |
|
Folder 10 |
Comic Background Explorer (COBE) Launch and Early Orbit Operations ICP, TAS, and Timeline Review, Voice Plan, Launch and Early Orbit Timeline, August 24, 1989 |
|
Folder 11 |
CSDR Programmer's Manual COBETRIEVE Volume / Cosmic Background Explorer (COBE), COBE Science Data Room (CSDR) |
|
Folder 12 |
DMR Test Script for 53 GHz Calibration and Offset Measurement Test, January 24, 1989 |
|
Folder 13 |
DMR Systematic Error Review, September 19, 1990 |
|
Folder 14 |
Cosmic Background Explorer (COBE) Launch and Early Orbit Operations Handbook, November 1989 |
|
Folder 15 |
DMR Test Scripts |
|
Folder 16 |
DMR Stol Procs |
|
Folder 17 |
Technical Status Review COBE/FIRAS, September 15, 1986 |
| Box 4 |
Folder 1 |
Technical Status Review COBE Instruments, September 15, 1986 |
|
Folder 2 |
COBE Instrument Technical Status Review, Day 2 DIRBE, July 20-23, 1987 |
|
Folder 3 |
COBE Instrument Technical Status Review, Day 3, Morning FIRAS, July 20-23, 1987 |
|
Folder 4 |
COBE Instrument Technical Status Review, Day 4 DMR, July 20-23, 1987 |
|
Folder 5 |
Reference Horn and Internal Calibrator (ICAL) Assembly |
|
Folder 6 |
Thermal Vacuum Bakeout of the COBE Flight Harness |
|
Folder 7 |
COBE DMR Notebook - Jon Aymon, 1989 |
|
Folder 8 |
STX COBE Project Audit Results, August 16, 1991 |
|
Folder 9 |
COBE Program Performance Verification Matrix, November 1989 |
|
Folder 10 |
DIRBE - Status Report |
|
Folder 11 |
DMR Status Report |
|
Folder 12 |
COBE Transition Review - FIRAS Instrument and Project Science, December 10, 1990 |
|
Folder 13 |
CSDR PDR, 1986 |
|
Folder 14 |
COBE L&EO Operations: A Recap and Final Operations Report, November 28, 1989 |
|
Folder 15 |
Approved Integrated Checkout Plan, Version 4 |
|
Folder 16 |
External Calibrator Mechanism Assembly, June 1988 |
|
Folder 17 |
Voice Plan Revision 2 |
|
Folder 18 |
Vibration Test Plan for COBE/FIRAS External Calibrator and Mechanism Protoflight Unit (PFU) in the 34 inch LN2 Dewar |
|
Folder 19 |
COBE CCB Meeting Agenda for Meeting, September 21, 1989 |
|
Folder 20 |
COBE Transition Status Review CSDR, December 10, 1990 |
|
Folder 21 |
COBE Thermal Subsystem Overview / R.A. Chambers, September 7, 1989 |
|
Folder 22 |
COBE Bi-Annual NASA Headquarters Review Differential Microwave Radiometers (DMR), September 7, 1989 |
|
Folder 23 |
COBE Mission Overview - D. McCarthy, September 7, 1989 |
|
Folder 24 |
COBE Instruments Pre-Integration Review FIRAS, September 1, 1988 |
|
Folder 25 |
COBE Instruments Pre-Integration Review DIRBE, September 2, 1988 |
|
Folder 26 |
Pipeline Overview, June 26, 1990 |
|
Folder 27 |
DMR Launch and Early Operations Report, December 7, 1989 |
|
Folder 28 |
COBE Project Office Transition Review, December 10, 1990 |
|
Folder 29 |
COBE Transition Review / Command Management Facility Spacecraft Control Programs Branch Code 514 / BENDIX, December 10, 1990 |
|
Folder 30 |
COBE Transition Review FDF Support, December 10, 1990 |
|
Folder 31 |
COBE Flight Operations Review CSDR Operations Readiness, September 25-27, 1989 |
|
Folder 32 |
COBE CSDR Operations and Maintenance Support Plan Vol. 1 Draft, September 8, 1989 |
|
Folder 33 |
GSFC Specification Far Infrared Absolute Spectrophometer (FIRAS), November 1979 |
|
Folder 34 |
Muller Blueprints and Design Documents - Geranium Detector |
|
Folder 35 |
Muller Blueprints and Design Documents - Siphotodiode |
|
Folder 36 |
Muller Blueprints and Design Documents - 11B500 GE Pulser Folder 1 Hardware |
|
Folder 37 |
Muller Blueprints and Design Documents - 11B500 Drawings of 2.3m Telescope Base at Siding Spring / Mt. Stromlo / From John Hart |
|
Folder 38 |
Muller Blueprints and Design Documents -11B500 Ge Detector Hardware |
|
Folder 39 |
COBE DMR Pipeline - Logbooks, Jon Aymon, 1985-1990 |
| Box 5 |
Folder 1 |
COBE Memo Index |
|
Folder 2 |
APCS COBE Blurbs |
|
Folder 3 |
COBE Newsletter, December 1978 |
|
Folder 4 |
Correspondence FYI Reports, January 23, 1979 |
|
Folder 5 |
FYI 1-001, December 21, 1978 |
|
Folder 6 |
FYI-1-002, December 21, 1978 |
|
Folder 7 |
FYI-1-003 |
|
Folder 8 |
FYI-1-004 |
|
Folder 9 |
FYI-1-09, February 16, 1979 |
|
Folder 10 |
FYI-1-10, February 21, 1979 |
|
Folder 11 |
FYI-1-012 |
|
Folder 12 |
Letters to NASA [1 Letter dated October 5, 1979], [1979] |
|
Folder 13 |
NASA Info |
|
Folder 14 |
COBE Correspondence NASA HQ to LBL/SSL |
|
Folder 15 |
COBE Correspondence LBL/SSL to NASA HQ |
|
Folder 16 |
COBE Correspondence LBL/SSL to Goddard |
|
Folder 17 |
COBE Correspondence ONR to LBL/SSL |
|
Folder 18 |
COBE Correspondence Goddard to LBL/SSL |
|
Folder 19 |
COBE Correspondence Princeton to LBL/SSL |
|
Folder 20 |
COBE Correspondence JPL to LBL/SSL |
|
Folder 21 |
The Italian Connection |
|
Folder 22 |
COBE Memo 2002 |
|
Folder 23 |
COBE Memo 2003 |
|
Folder 24 |
COBE Memo 2004 |
|
Folder 25 |
COBE Memo 2005 |
|
Folder 26 |
COBE Memo 2006 |
|
Folder 27 |
COBE Memo 2007 |
|
Folder 28 |
COBE Memo 2008 |
|
Folder 29 |
COBE Memo 3000 |
|
Folder 30 |
COBE Memo 4005 |
|
Folder 31 |
COBE Memo 4006 |
|
Folder 32 |
COBE Memo 4007 |
|
Folder 33 |
COBE Memo 4009 |
|
Folder 34 |
COBE Memo 4010 |
|
Folder 35 |
COBE Memo 5000 |
|
Folder 36 |
COBE Memo 5001 |
|
Folder 37 |
COBE Memo 5003 |
|
Folder 38 |
COBE Memo 5004 |
|
Folder 39 |
COBE Memo 5005 |
|
Folder 40 |
COBE Memo 5007 |
|
Folder 41 |
COBE Memo 5008 |
|
Folder 42 |
COBE Memo 5009 |
|
Folder 43 |
COBE Memo 5009a - Systematic Error 8V797 |
|
Folder 44 |
COBE Memo 5011 |
|
Folder 45 |
COBE Memo 5013 |
|
Folder 46 |
COBE Memo 5015 |
|
Folder 47 |
COBE Memo 5016 |
|
Folder 48 |
COBE Memo 5017 |
|
Folder 49 |
COBE Memo 5018 |
|
Folder 50 |
COBE Memo 5019 |
|
Folder 51 |
COBE Memo 5020 |
|
Folder 52 |
COBE Memo 5021 |
|
Folder 53 |
COBE Memo 5022 |
|
Folder 54 |
COBE Memo 5023 |
|
Folder 55 |
COBE Memo 5024 |
|
Folder 56 |
COBE Memo 5002 |
|
Folder 57 |
COBE Memo 5025 |
|
Folder 58 |
COBE Memo 5026 |
|
Folder 59 |
COBE Memo 5029 |
|
Folder 60 |
COBE Memo 5030 |
|
Folder 61 |
COBE Memo 5031 |
|
Folder 62 |
COBE Memo 5032 [Pointing] |
|
Folder 63 |
COBE Memo 5047 |
|
Folder 64 |
COBE Memo 5050 (469) |
|
Folder 65 |
COBE Memo 6000 |
|
Folder 66 |
COBE Memo 6001 |
|
Folder 67 |
COBE Memo 6003 |
|
Folder 68 |
COBE Memo 6004 |
|
Folder 69 |
COBE Memo 6005 |
|
Folder 70 |
COBE Memo 6006 |
|
Folder 71 |
COBE Memo 6007 |
|
Folder 72 |
COBE Memo 6008 |
|
Folder 73 |
COBE Memo 6009 |
|
Folder 74 |
Pointing |
|
Folder 75 |
Sensitivity to Opening Angles [COBE Memo 5029] |
| Box 6 |
Folder 1 |
Spherical Harmonics |
|
Folder 2 |
Letters and Memos to Project, [1981-1989] |
|
Folder 3 |
Dick Weber, [1980-1987] |
|
Folder 4 |
FIRAS |
|
Folder 5 |
CCRs [Configuration Change Request] |
|
Folder 6 |
Smoot |
|
Folder 7 |
Letters to COBE People |
|
Folder 8 |
Dave Nace |
|
Folder 9 |
Bennett, Chuck |
|
Folder 10 |
COBE DMR Thermal Requirements |
|
Folder 11 |
Thermal |
|
Folder 12 |
Calibrators, DMR |
|
Folder 13 |
Thermal Analysis |
|
Folder 14 |
John Mather, [1982-1988] |
|
Folder 15 |
Ned Wright |
|
Folder 16 |
Goddard Horn Patterns |
|
Folder 17 |
Magnetic Effect |
|
Folder 18 |
Antenna Covers |
|
Folder 19 |
DMR Cooled Receivers |
|
Folder 20 |
STM Microphonic Test |
|
Folder 21 |
Pattern Measurements of a Low-Sidelobe Horn Antenna |
|
Folder 22 |
System Specifications |
| Box 7 |
Folder 1 |
IPDU |
|
Folder 2 |
Measurement of Reflection and Emission from Styrofoam - Kaplan Antenna Covers |
|
Folder 3 |
DMR Shield / Sidelobes |
|
Folder 4 |
DMR FIRAS Interference |
|
Folder 5 |
Data Electronics Unit Dev. |
|
Folder 6 |
Mechanical |
|
Folder 7 |
DMR Telemetry Displays / IGSE Software |
|
Folder 8 |
COBE Science Working Room |
|
Folder 9 |
DMR Drift |
|
Folder 10 |
Advanced Receivers |
|
Folder 11 |
COBE Tech. Review Response, August 1980 |
|
Folder 12 |
COBE Tech Review NASA, May 1980 |
|
Folder 13 |
COBE Tech Review, April 1980 |
|
Folder 14 |
Statements of Work |
|
Folder 15 |
COBE Team Meetings - COBE (SWG) Science Work Group |
|
Folder 16 |
COBE Meeting, March 19-20, 1981 |
|
Folder 17 |
COBE Meeting, December 11-12, 1980 |
|
Folder 18 |
COBE Meeting, July 7-8, 1990 |
|
Folder 19 |
COBE Meeting, March 27-29, 1980 |
| Box 8 |
Folder 1 |
FIRAS Preliminary Design Review Vol. 1 |
|
Folder 2 |
Hinners Review [COBE Status Review to Code 100] |
|
Folder 3 |
COBE Instruments PDR Vol. II DMR, June 2-3, 1983 |
|
Folder 4 |
COBE Team Meeting, December 5-7, 1979 |
|
Folder 5 |
COBE Meeting, September 29-30, 1979 |
|
Folder 6 |
COBE Team Meeting, July 18 - 20, 1979 |
|
Folder 7 |
COBE Team Meeting, March 30-31, 1979 |
|
Folder 8 |
COBE Team Meeting, January 12-13, 1979 |
|
Folder 9 |
COBE Team Meeting, October 13-14, 1978 |
|
Folder 10 |
COBE Team Meeting, April 1978 |
|
Folder 11 |
1st, 2nd, and 3rd COBE Meetings |
|
Folder 12 |
COBE Diagrams and Instruments |
|
Folder 13 |
31.4 GHz Receiver |
|
Folder 14 |
Equipment and Parts |
|
Folder 15 |
COBE Instruments Monthly Status |
|
Folder 16 |
COBE Publications |
|
Folder 17 |
Memorandum of Understanding |
|
Folder 18 |
Cost Review Instrument |
|
Folder 19 |
Altitude Control Critical Design Review |
|
Folder 20 |
Electrical System Review |
|
Folder 21 |
Performance Spec. Revision A |
|
Folder 22 |
Cost Review Technical [HDQ Review] |
|
Folder 23 |
Twin Industries Inc. |
| Box 9 |
Folder 1 |
IDR |
|
Folder 2 |
Reports and Documents - COBE Financial Management Reports |
|
Folder 3 |
Periodic Meeting Reports #1 |
|
Folder 4 |
Periodic Meeting Reports #2 |
|
Folder 5 |
Progress Reports from Goddard |
|
Folder 6 |
Engineering Monthly Reports Jan-Dec |
|
Folder 7 |
Manpower Reports |
|
Folder 8 |
COBE White Report |
|
Folder 9 |
DIRBE Monthly Report |
|
Folder 10 |
FIRAS Monthly Report |
|
Folder 11 |
Blue Team Meetings |
|
Folder 12 |
Notes and Memos |
|
Folder 13 |
UCBSSL No.636-77 Satellite Proposal |
|
Folder 14 |
Status Report for COBE, August 1, 1977 |
|
Folder 15 |
NASA COBE Continuation 81 |
|
Folder 16 |
NAS5-24105 Cumulative Report Listings, October 1977 |
|
Folder 17 |
Final Report - NAS5-24105, May 9, 1978 |
|
Folder 18 |
Contract Correspondence, NAS5-24105 (Administrative), May 9, 1978 |
|
Folder 19 |
COBE Proposal 3/81 and Modification, 1981 |
|
Folder 20 |
DIRBE and FIRAS and DMR |
|
Folder 21 |
IDR - DIRBE |
| Box 10 |
Folder 1 |
IDR - FIRAS |
|
Folder 2 |
DIRBE Experiment on COBE |
|
Folder 3 |
FIRAS Experiment on COBE |
|
Folder 4 |
Specifications - DMR |
|
Folder 5 |
DMR |
|
Folder 6 |
DMR Proposal Outline |
|
Folder 7 |
Aerojet - Aerojet Budget Work - COBE |
|
Folder 8 |
COBE Correspondence LBL to Aerojet |
|
Folder 9 |
COBE Correspondence Aerojet to LBL |
|
Folder 10 |
Data Analysis - General Info |
|
Folder 11 |
Ground Support Equipment |
|
Folder 12 |
IAC Background Material |
|
Folder 13 |
CSC |
|
Folder 14 |
JPL Data Analysis |
|
Folder 15 |
Quadrilateralized Spherical Cube Database |
|
Folder 16 |
Headquarters Review, April 1988 |
|
Folder 17 |
Astrophysics Data Operations |
|
Folder 18 |
Delta Critical Design Review |
|
Folder 19 |
CACS |
|
Folder 20 |
DIDCS |
|
Folder 21 |
Subject Report - COBE AEM-ERBS Module |
|
Folder 22 |
COBE Science Payload Evaluation Study |
|
Folder 23 |
COBE Instrument Implementation Plan |
|
Folder 24 |
Performance Assurance Requirements |
|
Folder 25 |
Budgeting and Planning - COBE Budget Estimates |
|
Folder 26 |
COBE DMR Finances |
|
Folder 27 |
COBE 533 Reports for NAS5-27592 |
|
Folder 28 |
COBE 533 Reports for NAS5-25007 |
|
Folder 29 |
COBE Study Proposal |
|
Folder 30 |
COBE Status Report for NAS5-24105 (8/1/77), August 1977 |
| Box 11 |
Folder 1 |
PEPPP |
|
Folder 2 |
1981 Bi-Monthly Reports |
|
Folder 3 |
1980 Bi-Monthly Reports |
|
Folder 4 |
1979 Bi-Monthly Reports |
|
Folder 5 |
1978 Bi-Monthly Reports |
|
Folder 6 |
COBE 25007 Reports - COBE (NAS5-25007) Monthly Report Covers |
|
Folder 7 |
COBE Monthly Report, March 1978 |
|
Folder 8 |
COBE Monthly Report, May 1978 |
|
Folder 9 |
COBE Monthly Report, July 1978 |
|
Folder 10 |
COBE Monthly Report, September 1978 |
|
Folder 11 |
COBE Monthly Report, November 1978 |
|
Folder 12 |
COBE Monthly Report, January 1979 |
|
Folder 13 |
COBE Monthly Report, March 1979 |
|
Folder 14 |
COBE Monthly Report, May 1979 |
|
Folder 15 |
COBE Monthly Report, July 1979 |
|
Folder 16 |
COBE Monthly Report, September 1979 |
|
Folder 17 |
COBE Monthly Report, November 1979, March 1980 |
|
Folder 18 |
Statement of Work |
|
Folder 19 |
Report Guidelines |
|
Folder 20 |
PI's Responsibilities |
|
Folder 21 |
Program Plan, Final, 1978-1979 |
|
Folder 22 |
Final COBE, 1978-1979 |
|
Folder 23 |
COBE Final Report, 1980 |
|
Folder 24 |
COBE Final Report, 1981 |
|
Folder 25 |
COBE Final Report, 1978-1983 |
|
Folder 26 |
Program Plan, Drafts and Materials |
|
Folder 27 |
COBE Charter |
|
Folder 28 |
Administrative Correspondence NAS5-25007 |
|
Folder 29 |
Proposal, Contract and Associated Stuff - Proposal to NASA 1/25/78 which became NAS5-25007, 1978-1979 |
|
Folder 30 |
COBE Continuation Proposal, January 1980 |
|
Folder 31 |
Contract, NASA #: NAS5-25007, March 1, 1978 |
|
Folder 32 |
Contract Modifications |
|
Folder 33 |
Statement of Work, November 11, 1977 |
|
Folder 34 |
Administrative Correspondence NAS5-25007 |
|
Folder 35 |
Cumulative Reports NAS5-25007 |
|
Folder 36 |
Cumulative Reports NAS5-25007 Smoot |
|
Folder 37 |
COBE Overview, 1980 |
|
Folder 38 |
Cumulative Reports NAS5-27592 Smoot |
|
Folder 39 |
Administrative Correspondence NAS5-27592 Smoot |
| Box 12 |
Folder 1 |
IDSP GSFC 1982 rev. 1984 |
|
Folder 2 |
CSC Report on COBE data Management |
|
Folder 3 |
CSC COBE Data Processing |
|
Folder 4 |
COBE IGSE Capabilities |
|
Folder 5 |
ECIL CSC, May 1978 |
|
Folder 6 |
COBE System Concept Review Science Data Room Science Working Group Responsibilities, January 25, 1985 |
|
Folder 7 |
COBE Instruments [DMR CDSR, Science Processing Design, Data Sets for FIRAS, DIRBE, DMR, Data Dictionary] |
|
Folder 8 |
COBE Instruments [IGSE, STOL Capabilities] |
|
Folder 9 |
COBE Instruments [Observability] |
|
Folder 10 |
COBE Instruments [COBE Coordinate Systems Definition, Fluctuations Observability, Data Reduction, Operations Concept, DMR Instrument Definition Report, Statement of Work …] |
|
Folder 11 |
COBE Instruments [Walsh Transforms, COBE Memos, Data Processes, FIRAS and DMR Software] |
|
Folder 12 |
COBE Instruments [CDSR Science Working Group - SWG] |
|
Folder 13 |
COBE Instruments [SWG, DMR Mid-Term Test Review] |
|
Folder 14 |
COBE Instruments [DIRBE Stray Light Analysis, CSDR Preliminary Design Review] |
|
Folder 15 |
COBE Instruments [Instrument Definition Report for DMR] |
|
Folder 16 |
COBE Instruments [Instrument Definition Report - Isotropy Instrument - DMR] |
|
Folder 17 |
COBE Instruments [Instruments Flight Performance Requirements, Systems Requirements] |
|
Folder 18 |
COBE Instruments [SWG, Project Status Review, Calibration Report, Fracture Control Panel, Microphonics] |
|
Folder 19 |
COBE Instruments [SWG Meeting Notes, Microphonics, Accelerated Schedule Proposal, Calibration Data Sets, Instruments Development] |
| Box 13 |
Folder 1 |
COBE Instruments [Instrument Definition Report for DIRBE, COBE PER Instruments, COBE/Delta OMNI Deployment Mechanism] |
|
Folder 2 |
COBE Instruments [Pre-Integration Review - DMR, GSFC Specification, DMR Interface Control Document, Performance Verification Matrix] |
|
Folder 3 |
COBE Instruments [PDR Vol. III : DIRBE, June 6-7, 1983 |
|
Folder 4 |
COBE Instruments [DMR Monthly from GFSC] |
|
Folder 5 |
COBE Instruments [Execution Phase Project Plan, COBE FIRAS SWG, DMC Moon Calibration, IRAS Lessons Learned, Performance Specification, Program Requirements and Design Guidelines for DIRBE] |
|
Folder 6 |
COBE Instruments [Execution Phase Project Plan, Verification Specification, Fracture Control Plan, Minutes COBE Phase I and DEWAR Phase II Safety Review] |
|
Folder 7 |
COBE Instruments [COBE Concepts Review, Minutes from Phase 0 Safety Review, Biannual Review] |
|
Folder 8 |
COBE Instruments [Fracture Control Plan, FIRAS Interface Control Document] |
|
Folder 9 |
COBE Instruments [Pre-Environmental Review Vol. 1] |
|
Folder 10 |
COBE Instruments [Pre-Environmental Review Vol. 2] |
|
Folder 11 |
COBE Instruments [Critical Design Review Vol. 1] |
|
Folder 12 |
COBE Instruments [Critical Design Review Vol. II] |
|
Folder 13 |
COBE Instruments [Critical Design Review Vol. III] |
|
Folder 14 |
COBE Instruments [DMR Subsystem Software, CSDR Data Management, CSDR News Bulletins, GDS - Spacecraft Database Status] |
|
Folder 15 |
COBE Instruments [Mission Operations and Command Verification, Mission Planning Tools, Coordinate Definitions, Attitude Control, DMR Diagnostics, RIDs from CSDR CDR] |
|
Folder 16 |
COBE Instruments [CSDR CDR Review, Operations and Data Analysis Requirements - SWG, GSFC Specification for DMR, FIRAS Enquirer, SWG Pipeline Test, Delta Axes and Orientation] |
|
Folder 17 |
COBE Instruments [CSDR CDR RID Responses, FIRAS SWG Pipeline, data Management Subsystem Build 1, Minutes - Attitude Requirements Meeting, Delta CDR, Validation Plan] |
| Box 14 |
Folder 1 |
COBE Instruments [SWG Project Pipeline Tests, Software Development, CSDR, IGSE, Mission Planning, and Operations, CAC Operations Agreement] |
|
Folder 2 |
COBE Bi-Monthly Report |
|
Folder 3 |
George [Bi-Monthly Progress Report] |
|
Folder 4 |
Scott [Bi-Monthly Progress Report] |
|
Folder 5 |
Phil [Bi-Monthly Progress Report] |
|
Folder 6 |
Chris [Bi-Monthly Progress Report] |
|
Folder 7 |
Steven [Bi-Monthly Progress Report] |
|
Folder 8 |
Reports and Timetables |
|
Folder 9 |
COBE General Info |
|
Folder 10 |
Preparation for Bi-Monthly Report for Months of January-February, 1980 |
|
Folder 11 |
COBE Monthly Report |
|
Folder 12 |
Design Proposal - COBE |
|
Folder 13 |
Design Proposal - Goddard Briefing, April 28, 1975 |
|
Folder 14 |
COBE Design Proposal, 1978 |
|
Folder 15 |
Design Proposal - COBE SRT Proposal |
|
Folder 16 |
3 K Anistropy Satellite Proposal |
|
Folder 17 |
Design Proposal - Cosmic Microwave Experiment Proposal, 1976 |
|
Folder 18 |
Design Proposal - Goddard, MIT Princeton [Cosmological Background Radiation Satellite], [October 1974] |
|
Folder 19 |
Design Proposal - [Ball Brothers, Boeing] |
|
Folder 20 |
Design Proposal - [Feasibility Study of the Boeing Small Reasearch Module] |
|
Folder 21 |
Design Proposal [Small Research Module Auroral Satellite] |
|
Folder 22 |
Design Proposal - [Satellite Calculations] |
|
Folder 23 |
Design Proposal [Heat Capacity Mapping Mission] |
|
Folder 24 |
Design Proposal - [NASA, Lockheed Martin] |
|
Folder 25 |
Design Proposal - Scout |
|
Folder 26 |
Design Proposal - IRAS |
| Box 15 |
Folder 1 |
Design Proposal - AO #6 and 7 |
|
Folder 2 |
Design Proposal - Miscellaneous Drawings |
|
Folder 3 |
3 K Isotropy Experiment Satellite Proposal |
|
Folder 4 |
Satellite Management Section |
|
Folder 5 |
Specifications - Biannual Review, June 1984 |
|
Folder 6 |
Far Infrared Absolute Spectrophotometer (FIRAS) Preliminary Performance Specification and Flight Subsystem Design |
|
Folder 7 |
Specifications - COBE DMR Interface Control Document |
|
Folder 8 |
Specifications - COBE Thermal Specifications |
|
Folder 9 |
Specifications - Spacecraft Observation Preliminary Design Review |
|
Folder 10 |
COBE Third Quarterly Meeting, 1983 |
|
Folder 11 |
Specifications - COBE Electrical Systems Design Handbook |
|
Folder 12 |
On Orbit Attitude Control of COBE |
|
Folder 13 |
Phase 0, 1 Safety Review COBE, 1982 and 1985 |
|
Folder 14 |
Specifications - Configuration Management Plan |
|
Folder 15 |
Specifications - Dicke Switch - Critical Design Review |
|
Folder 16 |
Equipment and Software Data Processing |
|
Folder 17 |
Missing Operations Planning Review |
|
Folder 18 |
Mission Phase Power Status Summaries |
|
Folder 19 |
Dollar / Schedule / Manpower Report |
|
Folder 20 |
Payload Operations Prelim Design Review |
| Box 16 |
Folder 1 |
Support Instrumentation Requirements |
|
Folder 2 |
Sun Shade Mission Analysis, 1983 |
|
Folder 3 |
System Safety Plan, 1982 |
|
Folder 4 |
Dewar System Specifications |
|
Folder 5 |
Preliminary Ground System Scenario |
|
Folder 6 |
Structural, Thermal, Power Summaries |
|
Folder 7 |
COBE Project Start |
|
Folder 8 |
COBE Structure |
|
Folder 9 |
COBE Periodic Meetings |
|
Folder 10 |
DMR System Concept |
|
Folder 11 |
Instruments Development Plan |
|
Folder 12 |
System Concept Review Project Response |
|
Folder 13 |
System Concept Review Problem Report |
|
Folder 14 |
Data Analysis and GSE Documents and Software |
|
Folder 15 |
Science Data Analysis Software Documentation Vol. 2 |
|
Folder 16 |
Science Data Analysis Software Prelim Review |
|
Folder 17 |
Instrument Ground Support Equipment |
|
Folder 18 |
Science Working Group |
|
Folder 19 |
Failure Mode Effects and Criticality Analysis |
|
Folder 20 |
System Concept Review |
|
Folder 21 |
COBE Blue Team Review, May 5-8, 1981 |
|
Folder 22 |
DMR Systematic Error Review, December 17, 1991 |
|
Folder 23 |
DMR Software Guide, December 1991 |
|
Folder 24 |
CSDR Hitchhiker's Guide Draft, August 1988 |
|
Folder 25 |
COBE Science Data Room System Test Plan Revision 1.0, June 1988 |
|
Folder 26 |
NASA Headquarters COBE Technical and Cost Review, July 21, 1981 |
|
Folder 27 |
COBE Data Analysis Algorithms |
| Box 17 |
Folder 1 |
COBE - General Info [Overview, Schedule, Newsletter, DMR Status] |
|
Folder 2 |
COBE Performance Specification for a Delta Launch |
|
Folder 3 |
Gain Stability Support |
|
Folder 4 |
Computer Program for Diode Detector Linearity Evaluation - COBE Note DMR 016 |
|
Folder 5 |
Microwave Antenna Analysis Reports |
|
Folder 6 |
Prelim Thermal Analysis for DMR Thermal Balance Unit |
|
Folder 7 |
Breadboard Test Plan |
|
Folder 8 |
COBE Instrument Technology Review |
|
Folder 9 |
Data Manage [Report Drafts, Data Requirements and Interface, Telemetry Stream, Reduction and Analysis, CSC] |
|
Folder 10 |
COBE Cost Estimates |
|
Folder 11 |
COBE Blue Team Review, May 5-8, 1981 |
|
Folder 12 |
COBE Science Data Requirements |
|
Folder 13 |
Active DMR |
|
Folder 14 |
GSFC Specification for the COBE DMR |
|
Folder 15 |
DMR Proposal March 1980 |
|
Folder 16 |
Interface |
|
Folder 17 |
Experiment Requirements Documents |
|
Folder 18 |
Miscellaneous Documents - Drawings, Document Change Log, Calibration, Observatory Magnetic Test Plan Rev. A, CSDR 30 Day Plan Preparation, Test Plan for ETU Thermal Shield Integrity Test |
|
Folder 19 |
COBE Memos |
|
Folder 20 |
COBE/IPDU |
|
Folder 21 |
Circulators |
|
Folder 22 |
DMR 53 Interceptor Plates |
|
Folder 23 |
DMR 53 Electronics |
|
Folder 24 |
DMR 53 Antenna |
| Box 18 |
Folder 1 |
DMR - Electronics |
|
Folder 2 |
COBE Dewar |
|
Folder 3 |
DMR 53/90 |
|
Folder 4 |
DMR - 90 |
|
Folder 5 |
DMR-31 |
|
Folder 6 |
DMR 53 Radiator |
|
Folder 7 |
DMR 53 Assembly |
|
Folder 8 |
DMR 53 Frame |
|
Folder 9 |
Mission Operations Planning Review Vol. 3, May 6-7, 1986 |
|
Folder 10 |
IGSE |
| Box 19 |
Folder 1 |
DMR Verification Test Procedures - Bob Walla |
|
Folder 2 |
COBE Thermal Shield Integrity Test |
|
Folder 3 |
Mission Operations Review |
|
Folder 4 |
31 GHz Powerups COBE |
|
Folder 5 |
DMR/COBE Manuals, Explanation, Guides, Notes |
|
Folder 6 |
DMR User Guide |
|
Folder 7 |
COBE Test Planning Meetings Minutes |
|
Folder 8 |
Data |
|
Folder 9 |
Noise Diode Stability from JPL Tests |
|
Folder 10 |
Final Report NSG 2125 |
|
Folder 11 |
Test Planning, Thermal Review, Post Environmental Review |
|
Folder 12 |
PERT, Budget Plan, SWG |
|
Folder 13 |
Miscellaneous Technical Documents and Photos |
|
Folder 14 |
Miscellaneous Technical Documents and Photos (part 2) |
| Box 20 |
Folder 1 |
SWG Meetings, July 13-14, 1992 |
|
Folder 2 |
Right Ascension |
|
Folder 3 |
MPD Plots |
|
Folder 4 |
DMR Vugraphs SWG, July 18, 1991 |
|
Folder 5 |
DMR Processing Diagram, IGSE Papers in Progress |
|
Folder 6 |
Graphs, Memos, Correspondence, Meeting Minutes |
|
Folder 7 |
Status Report on DIRBE, COBE Extended Mission, DIRBE Report to SWG, DMR Status, 1991 |
|
Folder 8 |
Anistropy Levels, Graphs, SWG Meetings, Anistropy Satellite, FIRAS |
|
Folder 9 |
Anistropy, DIRBE and DMR Sky Maps |
|
Folder 10 |
Graphs, DMR Post Regulators, COBE Thermal/RF Shield Requirements, COBE Coordinate Systems Definition, Execution Phase Project Plan, DMR Flight Telemetry and Control Temperature Sensors Installation Procedure, ESD Tests, Report to SWG |
|
Folder 11 |
Plots, Calibration, DMR Daily Quality Check |
|
Folder 12 |
Vugraphs |
|
Folder 13 |
Graphs, Data |
|
Folder 14 |
Graphs, DMR Software Meeting, DIRBE SWG Meeting |
|
Folder 15 |
Other ISO Materials Calculations etc. |
|
Folder 16 |
Physics [GSFC Specification, Verification Plan for DMR] |
|
Folder 17 |
Proposal - Infrared Space Observatory |
|
Folder 18 |
DIRBE Absolute Calibration |
|
Folder 19 |
IGSE Documentation |
|
Folder 20 |
Mission Operations Planning Review Vol. 1, May 6-7, 1986 |
|
Folder 21 |
Preliminary Design Review CSDR, Day One, February 27-28, 1986 |
|
Folder 22 |
Preliminary Design Review CSDR, Day Two, February 27-28, 1986 |
|
Folder 23 |
Science Working Group - Operations and data Analysis Requirements, February 10, 1986 |
|
Folder 24 |
DMR Subsystem |
|
Folder 25 |
CSDR Instruments |
|
Folder 26 |
SWG Meeting Agenda |
|
Folder 27 |
DIRBE Infrared Observations of the Ecliptic Poles |
|
Folder 28 |
GSFC Specifications for DMR Rev. A |
|
Folder 29 |
FIRAS External Calibrator |
|
Folder 30 |
COBE Project Directory and GSFC Directories |
|
Folder 31 |
SWG Meeting Agenda, 1993 |
|
Folder 32 |
DMR Software Guide, December 1991 |
|
Folder 33 |
FIRAS Status, May 22, 1993 |
|
Folder 34 |
DIRBE Schedule of Primary Events |
|
Folder 35 |
Proposed DIRBE Software Enhancements |
| Box 21 |
Folder 1 |
Temporary Special Use Permit / Transporting Equipment through Yosemite |
|
Folder 2 |
Ned Wright's Library COBLIB.LIS (July 9, 1985), Superceded (10/15/85), 1985 |
|
Folder 3 |
DMR Notebook |
|
Folder 4 |
COBE Project Objectives and General Description, 1984 |
|
Folder 5 |
Erice Papers |
|
Folder 6 |
DMR User Guide |
|
Folder 7 |
CSDR Database Manual |
| Box 22 |
Folder 1 |
4192 05 SKYQO WITEBSKY Film Comix 1 November 83 2 November 83 13.34 [Microfilm], November 1983 |
|
Folder 2 |
4192 05 DECFI02 LUBIN OUT1 09 Jul 82 12 Jul 82 09.45 02.25 8 FRN [Microfilm], July 1982 |
|
Folder 3 |
4190 05 ATTEN19 FILM35 COMIX AYMONG 02 Jun 79 04 Jun 79 PLOT 15.53 03.51 6 FRM [Microfilm], June 1979 |
|
Folder 4 |
Astrophysics U2 Microfiche |
|
Folder 5 |
To 6/24/77 [Microfiche], June 1977 |
|
|